Hybrid Solution, Technological Advancements, and Streamlined Preliminary Notice and Bond Claim Processes Improve Overall Efficiency for Steel and Metal Manufacturer
The CMC Steel Fabricators Inc. dba CMC Construction Services (CMC) credit team was overwhelmed and tangled in a spreadsheet mess, missing deadlines, and losing bond claim rights. They needed a technologically friendly program that would streamline their notice and bond claim processes, and track deadlines. NCS and CMC partnered to design a customized solution that has saved CMC time and money. Download this case study to learn how NCS’ hybrid solution and technological advancements have vastly improved CMC’s overall efficiency, their employee productivity, and their DSO.
Read more about how we've helped
To view this case study, please fill out the following form.
"*" indicates required fields